If you are using the Engineer Timesheets functionality in Protean, your engineers have the ability to record their time away from site for the last job of the day (e.g. to record travel back home).
To make this functionality available, within the main office system go to System > Settings > PDA Engineer Allow Completed Visit Travel Changes, and change this setting to Yes:
When the engineer signs off jobs on their mobile device, they will receive the following prompt:
If they check the box for the last job of the day, they are then able to sign off the job as usual. When they go to complete their timesheet afterwards, they can click on the last job and choose to Change Travel From Site:
This will load the time selector:
The engineer should select the amount of time it took to travel home, which will update the timesheet accordingly.